Elite Integrity Services
  • Careers
  • News
  • Services
    • Field Tank Construction
    • Repairs & Restorations
    • Engineering & Specialty Services
  • Projects
  • About
    • About
    • Locations
  • Quality & Safety
  • Careers
  • News
  • Contact

Past
Projects

01 Central AB

New Tank Construction – Growing Client’s Inventory Capacity

An addition to their site in Central Alberta, meant this clients overall storage capacity at their rail terminal would be more than…

02 Central Alberta

New Tank Construction – Central Alberta

This 70,000 bbl tank moved from concept to completion in just over (3) months. Due to market volatility in 2020, the client…

03 East Central, Alberta

Inner City Tank Construction

With where this tank was located on the client’s property, our crew had to navigate tight and congested working conditions for the…

04 East Central Alberta

Tank Repair – Major Foundation Remediation & Tank Floor Replacement

This unique project required the existing tank to be elevated 4’ above its existing granular base. The 110’-0” diameter, multi-bay tank was…

05 Central, AB

Turnkey Operations On A Liquid Sulphur Tank – Central AB

Customer required an 8500 MT (30,000BBL) molten sulphur tank to be constructed. Elite Integrity Services executed a large scale turnkey operation on…

06 Southern Alberta

Turn Around Tank Replacement

Elite Integrity Services was recently contracted to complete an entire tank replacement project inside our clients 5-day turn around window. Working closely…

07 Northeast British Columbia

Multi-Tank Expansion Project

A large expansion to an existing facility in Northeast British Columbia including (8) tanks of varying sizes to be constructed within the…

08 British Columbia

Carbon Steel Pontoon Floating Roof

Elite was contracted to supply and install a replacement carbon steel pontoon floating roof into an existing 120’-0” diameter tank. Following the…

09 Central BC

New Fuel Distribution Facility

This project was executed in a remote desert location with extremely hot temperatures and nearby forest fires. The crews were challenged to…

10 Northeast BC

70,000 Barrels of Increased Gasoline Storage

This new 70,000 bbl gasoline storage tank was constructed in the middle of a highly congested, fully operational facility in Northeastern British…

11 NW Alberta

Pulp Mill Turnaround Project

Elite’s team was required to develop some creative engineering and operational solutions to support this high profile pulp mill shut down project…

12 North Western, AB

New Tank Construction – Executing Best in Quality Control

Working with our client at the onset to understand their needs, Elite was able to design, construct, and safely execute this project…

13 Northern, AB

Tank Repair – Client Needed an Elite Solution

When a Client has a unique problem, they require a unique solution! For this major repair project, Elite was contracted to restore…

14 Lloydminster, SK

New Tank Construction – Large Diameter & Expedited Schedule

The 115,576 BBL multi-bay, storage tank went from mobilization to mechanically complete in just over two and a half months. Tank construction included a…

15 Lloydminster, AB

Tank Repair – Floor Replacement & Major Foundation Installation

For this project Elite had to replace the tank floor and annular plates, as well as provide a new foundation to elevate…

16 Central Alberta

New Tank Construction – Multiple Tanks c/w Concrete Ring Walls

This project included the construction of (3) new tanks to be built in Central Alberta. The tanks all required hydro-testing, external painting,…

17 Northern Alberta (50km East) of Dawson Creek

New Tank Construction – Multi Tank Project

Three 30,000 bbl tanks required completion in a compressed schedule. Working with operations a revolving schedule was developed to accommodate continuous construction…

18 Northern, Alberta

Tank Repair – Major Annular Plate Replacement

Due to extreme soil side erosion, Elite was contracted to replace the entire annular plate on a 110’ diameter boiler feed water…

19 North Western Alberta

New Tank Construction – Multi Tank Project Compressed Schedule

Three 30,000 bbl tanks required completion in a compressed schedule. Working closely with operations, a revolving schedule was developed to accommodate continuous…

20

Custom Project – Converting an Existing Tank to a Skim Tank

Project Highlights: Tank Size: 55’-0” DIA x 55’-0” HG Tank Access: 9’-2 ½” HG x 11’-0” WD Door Sheet Crane Access: (1)…

21 North Central, AB

New Tank Construction – Expanding Infrastructure Required New Tanks in Short Order

To support expanding infrastructure of its assets, Elite’s client required the construction of a 100,000 bbl and 10,000 bbl storage tank at…

22 Elite Integrity Services Shop - Ponoka

Custom Project – Trailer Skid Package

INTRO: Worked with a new, small company to construct trailer mounted separation system. Project Highlights: Fabrication of (2) carbon steel cone bottom…

23 Elite Integrity Services Shop - Ponoka

Custom Project – Structural Platforms & Staircases

INTRO: Platforms and Staircases Project Highlights: Over the past years Elite Integrity Services have been asked to design and fabricate all shapes…

24 Central Alberta

Tank Repair – New Operational Service

An aging storage tank built in 1977 had undergone various service changes in its lifetime resulting in severe upper shell and roof…

25 North Eastern British Columbia

Tank Repair – External Floating Roof Lift

This tank required multiple repairs to the foundation, tank floor and external floating roof.  Various project constraints resulted in searching out alternative…

26 Northern Alberta

New Tank Construction – Expedited Schedule

Elite’s client required three new tanks constructed in a short schedule.  In five months, Elite successfully completed and turned over three 40,000…

27 North West Alberta

New Tank Construction – Skid Supplied Foundations

Due to environmental conditions at site Elite worked with their client to fabricate structural steel skids for tank foundations in lieu of…

28 North-Central Alberta

New Tank Construction – Self-Supported Dome Roof

Working with the client it was determined that a structurally supported roof was not suitable for the tank operation.  Elite engineered, pre-fabricated…

29 West Central Alberta

Tank Repair – Sulphur Tank Floor Replacement

Unique safety challenges are not uncommon when it comes to tank repairs and maintenance.  This project was unlike many due to the…

30 North West, Alberta

New Tank Construction – Remote Location

Due to the remote location special considerations were made to ensure the crew had suitable accommodations and attention was paid to work…

31 North East Alberta - Oilsands

New Tank Construction – Mine Diesel Tank

The 122,827BBL tank went from mobilization to mechanical completion in just over two and a half months. Working in close proximity with…

32 East Central Alberta

Tank Repair – Evolving Scope of Work

Engaged by the client prior to an out of service inspection created the opportunity to work with an evolving scope.  Having a…

33 North Central British Columbia

New Tank Construction – Multi Tank New Construction

Six 10,000 bbl tanks required completion in a compressed schedule.  Working with operations a revolving schedule was developed to accommodate continuous construction…

34 Cuba

Tank Repair – International Floor Replacement

A unique project specifically in terms of location.  Elite coordinated closely with the client to make arrangements to have equipments and material…

Elite Integrity Services

Calgary

#209, 3223 - 5th Avenue NE
Calgary AB T2A 6E9
P. 587.350.5900
Email Calgary

Edmonton

Suite 203, 9440 – 49th Street NW
Edmonton AB T6B 2M9
P. 780.433.0329
Email Edmonton

Ponoka

Ponoka Fabrication 431009
Range Road 261 Ponoka AB T4J 1R1
P. 403.783.2833
Email Ponoka
Tanksmarts
  • Copyright © 2018 Elite Integrity Services. All Rights Reserved.
  • Site Map
  • Privacy Policy
  • Disclaimer
  • Design by Web3 Marketing