New Tank Construction – Remote Location
Due to the remote location special considerations were made to ensure the crew had suitable accommodations and attention was paid to work in an environment where wildlife was present. In addition there were many distinct design considerations, which required collaboration with the client, Elite’s engineering team and the field crews. The team worked together to successfully construct two 20,000 bbl tanks.
Project Highlights:
- Roof skylights, rooftop perimeter handrails and flush type cleanout doors
- Sandborn internal floating roof
- Internal coating of floor and 3’-3” of shell
- Tank stairways were designed with a client specific box tubing handrail
- Project Size: (2) 63’-0” Diameter x 36’-0” High
- Project Type: New Construction
- Completion Date: October 2015
- Service: Crude Oil
More Projects
New Fuel Distribution Facility
Due to the remote location special considerations were made to ensure the crew had suitable accommodations and attention was paid to work…
70,000 Barrels of Increased Gasoline Storage
Due to the remote location special considerations were made to ensure the crew had suitable accommodations and attention was paid to work…
Pulp Mill Turnaround Project
Due to the remote location special considerations were made to ensure the crew had suitable accommodations and attention was paid to work…
Turnkey Operations On A Liquid Sulphur Tank – Central AB
Due to the remote location special considerations were made to ensure the crew had suitable accommodations and attention was paid to work…
Tank Repair – Major Foundation Remediation & Tank Floor Replacement
Due to the remote location special considerations were made to ensure the crew had suitable accommodations and attention was paid to work…