Inner City Tank Construction
With where this tank was located on the client’s property, our crew had to navigate tight and congested working conditions for the duration of the project. A client specific lift plan was generated to address the challenges with where this tank was being constructed. Once onsite, this 20,000 BBL external rafter storage tank took our crew under 1 month to complete.
Project Highlights:
- Single center column supporting an external rafter roof.
- Internal coating of the floor and lower 1 meter of shell, as well as the roof and 1 meter down the shell.
- 3D scanning technology was utilized both pre and post hydro-testing.
- 0 TRIF and 0 LTI’s
- Project Size: (1) 70’-0” Diameter x 30’-0” High
- Project Type: New Tank Construction
- Completion Date: December 2020
- Service: Kerosene Distillate
More Projects
New Fuel Distribution Facility
With where this tank was located on the client’s property, our crew had to navigate tight and congested working conditions for the…
70,000 Barrels of Increased Gasoline Storage
With where this tank was located on the client’s property, our crew had to navigate tight and congested working conditions for the…
Pulp Mill Turnaround Project
With where this tank was located on the client’s property, our crew had to navigate tight and congested working conditions for the…
Turnkey Operations On A Liquid Sulphur Tank – Central AB
With where this tank was located on the client’s property, our crew had to navigate tight and congested working conditions for the…
Tank Repair – Major Foundation Remediation & Tank Floor Replacement
With where this tank was located on the client’s property, our crew had to navigate tight and congested working conditions for the…