Engineering Specialty Services
Custom Project – Structural Platforms & Staircases
INTRO:
- Platforms and Staircases
Project Highlights:
- Over the past years Elite Integrity Services have been asked to design and fabricate all shapes and sizes of Platforms while adhering to CWB requirements. From small 3’ x 3’ intermediate platforms to large roof top radial platforms and even larger multi level roof top platforms.
- In addition to the Platforms Elite has fabricated CWB Ladders c/w safety cages.
- Elite Integrity Services has fabricated Berm Staircases as well as staircase extension to overcome the high tank foundations.
- Project Type: Structural
- Completion Date: N/A
More Projects
01
Northern Alberta
New Tank Construction with External Floating Roof (EFR)
Elite Integrity Services successfully delivered a 175,000 BBL API 650 dilbit storage tank featuring a steel pontoon external floating roof (EFR) in…
02
Central AB
New Tank Construction – Growing Client’s Inventory Capacity
An addition to their site in Central Alberta, meant this clients overall storage capacity at their rail terminal would be more than…
03
Central Alberta
New Tank Construction – Central Alberta
This 70,000 bbl tank moved from concept to completion in just over (3) months. Due to market volatility in 2020, the client…
04
East Central, Alberta
Inner City Tank Construction
With where this tank was located on the client’s property, our crew had to navigate tight and congested working conditions for the…
05
East Central Alberta
Tank Repair – Major Foundation Remediation & Tank Floor Replacement
This unique project required the existing tank to be elevated 4’ above its existing granular base. The 110’-0” diameter, multi-bay tank was…