Field Tank Construction
New Tank Construction – Large Diameter & Expedited Schedule
The 115,576 BBL multi-bay, storage tank went from mobilization to mechanically complete in just over two and a half months. Tank construction included a spiral staircase, rooftop platform and a multi-inlet fire foam suppression system. Our team worked closely with our client and coating sub-contractor to complete the external painting in sub-zero temperatures.
Project Highlights:
- Our crew completed this project safely, ahead of schedule and with zero weld repairs
- Special coating additives were used for sub zero external painting
- Project Size: (1) 131’-3” Diameter x 48’-0” High
- Project Type: New Construction
- Completion Date: October 2019
- Service: Diesel
More Projects
New Tank Construction with External Floating Roof (EFR)
Elite Integrity Services successfully delivered a 175,000 BBL API 650 dilbit storage tank featuring a steel pontoon external floating roof (EFR) in…
New Tank Construction – Growing Client’s Inventory Capacity
An addition to their site in Central Alberta, meant this clients overall storage capacity at their rail terminal would be more than…
New Tank Construction – Central Alberta
This 70,000 bbl tank moved from concept to completion in just over (3) months. Due to market volatility in 2020, the client…
Inner City Tank Construction
With where this tank was located on the client’s property, our crew had to navigate tight and congested working conditions for the…
Tank Repair – Major Foundation Remediation & Tank Floor Replacement
This unique project required the existing tank to be elevated 4’ above its existing granular base. The 110’-0” diameter, multi-bay tank was…