Field Tank Construction
New Tank Construction – 40,000 BBL Crude Oil Storage Tank
Elite Integrity Services successfully delivered a new 40,000 BBL API 650 crude oil storage tank in Northern Alberta, providing critical storage capacity through disciplined planning, strategic shop preparation, and experienced field execution.
Throughout construction, our team-maintained project momentum while working alongside ongoing civil and piling activities, ensuring efficient progress from start to finish.
A key project highlight was the self-performed installation of the full contact composite internal floating roof system. Utilizing our experienced crews allowed Elite to maintain direct control over quality, execution, and schedule while showcasing our ability to self-perform specialized tank construction scopes.
Completed ahead of schedule, this project reflects Elite's commitment to safe execution, skilled craftsmanship, and the reliable delivery of high-quality storage infrastructure.
Project Highlights
- Construction of a new 40,000 BBL crude oil storage tank
- Self-performed installation of full contact internal floating roof system
- Seamless execution across multiple contractors, disciplines, and project phases
- Delivered critical storage capacity ahead of client’s operational requirements
- Strong field leadership enabled the safe execution of construction activities throughout the project
- Project Size: 78'-0" Diameter x 48'-0" High (40,000 BBL)
- Project Type: New Tank Construction
- Completion Date: January 2026
- Service: Crude Oil Storage
More Projects
New Tank Construction with External Floating Roof (EFR)
Elite Integrity Services successfully delivered a 175,000 BBL API 650 dilbit storage tank featuring a steel pontoon external floating roof (EFR) in…
New Tank Construction – Growing Client’s Inventory Capacity
An addition to their site in Central Alberta, meant this clients overall storage capacity at their rail terminal would be more than…
New Tank Construction – Central Alberta
This 70,000 bbl tank moved from concept to completion in just over (3) months. Due to market volatility in 2020, the client…
Inner City Tank Construction
With where this tank was located on the client’s property, our crew had to navigate tight and congested working conditions for the…
Tank Repair – Major Foundation Remediation & Tank Floor Replacement
This unique project required the existing tank to be elevated 4’ above its existing granular base. The 110’-0” diameter, multi-bay tank was…