Field Tank Construction
New Tank Construction with External Floating Roof (EFR)
Elite Integrity Services successfully delivered a 175,000 BBL API 650 dilbit storage tank featuring a steel pontoon external floating roof (EFR) in Northern Alberta—showcasing Elite’s capability to execute complex, large-scale storage tank projects. To support an accelerated client schedule, Elite developed and implemented a construction strategy that allowed the tank shell and external floating roof to be built simultaneously. This approach helped streamline the schedule while maintaining control over safety, quality, and overall field construction. From engineering and shop fabrication through to field execution, our team delivered a high-quality storage tank that reflects Elite’s commitment to doing things the right way—safely, efficiently, and with a high level of professionalism.
Project Highlights:
- IFC main steel drawings issued within three weeks, including full design of a steel pontoon external floating roof (EFR).
- Pre-assembled at our Ponoka, AB facility, our team delivered (16) 40’ pontoon sections, highlighting our ability to efficiently support field construction.
- Installation of approximately 1.25 million pounds of structural steel.
- Successful implementation of concurrent tank and EFR construction strategy to accelerate schedule.
- Over 17,000 hours worked without a single lost time incident, reflecting strong safety performance and field leadership.
Delivering Complex Tank Projects with Confidence
This project is a strong example of Elite’s ability to successfully deliver API 650 storage tanks, external floating roof systems, and complex field construction projects across Western Canada—combining practical execution with a consistent focus on safety, quality, and schedule performance. Working closely with our client, this project reflects what can be achieved through strong collaboration, open communication, and a shared commitment to getting the job done right.
- Project Size: 163'-8" I.D. x 52'-0" High
- Project Type: New Tank Construction
- Completion Date: June 2025
More Projects
New Tank Construction – Growing Client’s Inventory Capacity
An addition to their site in Central Alberta, meant this clients overall storage capacity at their rail terminal would be more than…
New Tank Construction – Central Alberta
This 70,000 bbl tank moved from concept to completion in just over (3) months. Due to market volatility in 2020, the client…
Inner City Tank Construction
With where this tank was located on the client’s property, our crew had to navigate tight and congested working conditions for the…
Tank Repair – Major Foundation Remediation & Tank Floor Replacement
This unique project required the existing tank to be elevated 4’ above its existing granular base. The 110’-0” diameter, multi-bay tank was…
Turnkey Operations On A Liquid Sulphur Tank – Central AB
Customer required an 8500 MT (30,000BBL) molten sulphur tank to be constructed. Elite Integrity Services executed a large scale turnkey operation on…